Tom and Lisa entrusted us to carry on their bathroom remodels. Before us, Tom and Lisa actually hired a different contractor to do the project. However, after multiple delays and empty promises over a long period of 6 months, only half of their master bath was done and the so-called contractor was nowhere in sight. They were referred to us by a friend that just completed a bath remodel with us. After understanding the frustration that this couple had to go through, we decided to take on the challenge to make things right. Only the tile and bathtub were installed for the master bath, so we quickly installed white shaker style cabinets with a light grey quartz countertop to complement the design. A custom glass partition was put in place to finish off the space so that Tom and Lisa could comfortably use their master bath while we tackled the other two bathrooms. We kept the tile consistent throughout the bathrooms but unique features were installed for the vanities. Everything was done after 6 weeks, just in time for Lisa and Tom to host their out-of-town guests for their daughter’s wedding.